OFFSHORE PIPELAY & INSTALLATION


Alam Swiber Offshore (M) Sdn Bhd ("Alam Swiber") | Click for Brochure

As part of our strategic move to penetrate and engage in new business segment, Alam Swiber Offshore (M) Sdn Bhd ("Alam Swiber") was formed in 2009 to provide transportation, installation and commissioning of offshore pipelines, structure and subsea equipment services. Alam Swiber owns and operates the following barge:


• 1Mas-300, 300-man pipely accommodation workbarge | Click for Brochure

• Alam 251, 250ft material barge

• Alam 252, 250ft material barge


Heavy Lifting

Alam Swiber is able to transport and install any offshore platforms regardless of weight, dimension, water depth and complexity. We have the expertise, marine vessels, equipment and machinery to undertake the work safety, timely, economically and with quality. Alam Swiber's most recent achievement is the succesfull transportation and installation of E8 and F13K modules for Sarawak Shell Bhd (SSB). Each module weight more than 2,000 MT.The work was completed in May 2013 without any HSE incident, ahead of schedule and to the full satisfaction of Sarawak Shell Bhd (SSB).

Mooring / Subsea Facilities EPC

In 2011, Alam Swiber embarked into new area of Engineering, Procurement and Construction (EPC). The contract, involving engineering, procurement, fabrication, installation and pre-commisioning of two Single Point Mooring (SPM) units and subsea installation and pre-commisioning of two Pipeline End Manifolds (PLEM) units was succesfully completed in October 2012. The SPMs and PLEMs were fabricated in Labuan and installed at Offshore Kimanis, Sabah, fulfilling the HSE, schedule and quality requirements set by CLient.

Onshore Approach / Onshore Pipeline

Alam Swiber has a proven track record of executing shore approach and onshore pipelines in numerous projects such as KNAG, SOGT dual pipelines and BCOT. The works involved are cofferdam construction, holdback facilities, beach pull, piping at landfall, pipeline pre-commissioning, pipeline trenching and rock dumping. With a combination of experienced engineers, skilled workers and a fleet of heavy equipment marine vessels, Alam Swiber has the proven capability to deliver any similar project safely, timely, economically and with highest quality.

Offshore Pipeline

Alam Swiber owns 1MAS-300, an installation barge which can perform offshore instalation of pipeline up to 60 inches in diameter to water depth up to 100 meters. Recently completed projects are SOGT 28" and 36" Offshore Pipeline installation Project, and BCOT 24" Offshore Pipeline. Our methods of pipelay are either by pulling the pipeline from shore and continue with offshore pipe-lay or perform beach pull and partial pipelay seperately and perform mid-point tie-in or inter-platform installation of pipelines, spools and risers.

Latest
Annual Report

 
Latest
Quarterly Report

 
Latest
HSE Newsletter